The sports pitch by the Courbiac gym in Villeneuve-sur-Lot powers the heating in the building and produces hot water

 

  • A 90% drop in CO2 emissions
  • Avoiding 15 tCO2eq a year
  • Cut energy costs by 72%
  • Saving €8,000 a year

A few key figures

 

Needs:

  • Heat production: 54 MWh a year
  • Hot water production: 23 MWh a year
     

Installation:

  • Power Road® area: 130 sq. metres
  • Inter-season storage: 7 geothermal loops, 150 metres deep
  • Water-to-water heat pump: 64 kW
  • Seasonal coefficient of performance: 3.4

Praise for Power Road®

 

The Ademe and Lot-et-Garonne department covered 65% of the cost of the works.

 

Power Road® in pictures: