A pioneering solution to heat and cool the offices at a Eurovia works BU

Starting in the summer of 2025, the system will cover all the heating and cooling requirements at the 1,000 sq. metres of offices at Eurovia’s works BU in Le Mureaux.

  • CO2 emissions down 95%
  • 74% renewable energy in the mix

A few key figures

Needs:

  • Heat production: 45 MWh a year
    Cold production: 10 MWh a year

 
Installation:

  • Power Road® area: 250 sq. metres
  • Inter-season storage: 4 geothermal probes, 105 metres deep
  • Heat pump: 40 kW
  • Coefficient of performance: 4.2

Currently being finalised